Production schedule for filming
I think I will be filming over a weekend period of the 22nd of October till the 25th hopefully this will give me enough time to film most if not all of my shots.
Locations include:
· A field
· A bathroom in a house
· The street
· A bedroom in a house
However most of the filming will be done in a filed
These are my main four locations where I should get all my filming done as I can easily get myself to these places I do not think any problems will occur.
Timings
(New Plan) My first few scenes im going to film are the ones with both the boy and girl so Im going to film from 9.00 am Friday the 22nd, after I have picked the camera up from school for a few hours to about 12.00 pm.
Then I wont be filming on Saturday the 23rd anymore however from 3.00 pm on Sunday the 24th I can continue the filming of the scenes with the boy and girl then I have the rest of that week to finish the filming completley.
(Old Plan) As said in my plan I want to film in both the day and night so hopefully if possible I can begin early in the morning 9.00 am right the way through till 8.00 pm at night; however this will be a long winded day of filming that’s why I have chosen to do it over a weekend but if the filming can be completed in one day that would be great.
Then I wont be filming on Saturday the 23rd anymore however from 3.00 pm on Sunday the 24th I can continue the filming of the scenes with the boy and girl then I have the rest of that week to finish the filming completley.
(Old Plan) As said in my plan I want to film in both the day and night so hopefully if possible I can begin early in the morning 9.00 am right the way through till 8.00 pm at night; however this will be a long winded day of filming that’s why I have chosen to do it over a weekend but if the filming can be completed in one day that would be great.